Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida |
|---|
Topics: Interstate Highway System
|
Karen M. Brunelle
Federal Highway Administration
26 February 2021
[Federal Register Volume 86, Number 37 (Friday, February 26, 2021)]
[Notices]
[Pages 11822-11823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-03930]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions on Proposed Transportation
Project in Florida
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of limitation on claims for judicial review of actions
by Florida Department of Transportation (FDOT).
-----------------------------------------------------------------------
SUMMARY: The FHWA, on behalf of the FDOT, is issuing this notice to
announce actions taken by FDOT and other Federal Agencies that are
final agency actions. These actions relate to the proposed interchange
on Interstate 95 at Pioneer Trail (County Road 4118) in Volusia County,
State of Florida. These actions grant licenses, permits, or approvals
for the project.
DATES: By this notice, the FHWA, on behalf of FDOT, is advising the
public of final agency actions. A claim seeking judicial review of the
Federal Agency actions on the listed highway project will be barred
unless the claim is filed on or before July 26, 2021. If the Federal
law that authorizes judicial review of a claim provides a time period
of less than 150 days for filing such claim, then that shorter time
period still applies.
FOR FURTHER INFORMATION CONTACT: For FDOT: Jason Watts, Director,
Office of Environmental Management, FDOT, 605 Suwannee Street, MS 37,
Tallahassee, Florida 32399; telephone (850) 414-4316; email:
Jason.Watts@dot.state.fl.us. The FDOT Office of Environmental
Management's normal business hours are 8:00 a.m. to 5:00 p.m. (Eastern
Standard Time), Monday through Friday, except State holidays.
SUPPLEMENTARY INFORMATION: Effective December 14, 2016, the FHWA
assigned, and the FDOT assumed, environmental responsibilities for this
project pursuant to 23 U.S.C. 327. Notice is hereby given that FDOT and
other Federal Agencies have taken final agency actions subject to 23
U.S.C. 139(l)(1) by issuing licenses, permits, or approvals for the
proposed improvement highway project. The actions by FDOT and other
Federal Agencies on the project, and the laws under which such actions
were taken are described in the Type 2 Categorical Exclusion (CE)
issued on January 27, 2021 and in other project records for the listed
project. The Type 2 CE and other documents for the listed project are
available by contacting FDOT at the address provided above. The Type 2
CE and additional project documents can be viewed and downloaded from
the project website at: https://www.cflroads.com/project/436292-1.
The project subject to this notice is:
Project Location: Volusia County, Florida, I-95 Interchange at
Pioneer Trail (County Road 4118) in the City of Port Orange and the
City of New Smyrna Beach, Florida. This project will construct a new
interchange along I-95 at Pioneer Trail that includes stormwater
management and floodplain compensation ponds.
Project Actions: This notice applies to the Type 2 CE, and all
other Federal Agency licenses, permits, or approvals for the listed
project as of the issuance date of this notice and all laws under which
such actions were taken, including but not limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C.
4321 et seq.]; Federal-Aid Highway Act (FAHA) [23 U.S.C. 109 and 23
U.S.C. 128]; 23 CFR part 771.
2. Air: Clean Air Act (CAA) [42 U.S.C. 7401-7671(q)], with the
exception of project level conformity determinations [42 U.S.C. 7506].
3. Noise: Noise Control Act of 1972 [42 U.S.C. 4901-4918]; 23 CFR
772.
4. Land: Section 4(f) of the Department of Transportation Act of
1966 [23 U.S.C. 138 and 49 U.S.C. 303]; 23 CFR part 774; Land and Water
Conservation Fund (LWCF) [54 U.S.C. 200302-200310].
5. Wildlife: Endangered Species Act (ESA) [16 U.S.C. 1531-1544 and
1536]; Marine Mammal Protection Act [16 U.S.C. 1361-1423h], Anadromous
Fish Conservation Act [16 U.S.C. 757(a)-757(f)]; Fish and Wildlife
Coordination Act [16 U.S.C. 661-667(d)]; Migratory Bird Treaty Act
(MBTA) [16 U.S.C. 703-712]; Magnuson-Stevenson Fishery Conservation and
Management Act of 1976, as amended [16 U.S.C. 1801-1891d], with
Essential Fish Habitat requirements [16 U.S.C. 1855(b)(2)].
6. Historic and Cultural Resources: Section 106 of the National
Historic Preservation Act of 1966, as amended [54 U.S.C. 3006101 et
seq.]; Archaeological Resources Protection Act of 1979 (ARPA) [16
U.S.C. 470(aa)-470(II)]; Preservation of Historical and Archaeological
Data [54 U.S.C. 312501-312508]; Native American Grave Protection and
Repatriation Act (NAGPRA) [25 U.S.C. 3001-3013; 18 U.S.C. 1170].
7. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000 d-
2000d-1]; American Indian Religious Freedom Act [42 U.S.C. 1996];
Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
8. Wetlands and Water Resources: Clean Water Act (Section 319,
Section 401, Section 404) [33 U.S.C. 1251-1387]; Coastal Barriers
Resources Act (CBRA) [16 U.S.C. 3501-3510]; Coastal Zone Management Act
(CZMA) [16 U.S.C. 1451-1466]; Safe Drinking Water Act (SDWA) [42 U.S.C.
300f-300j--26]; Rivers and Harbors Act of 1899 [33 U.S.C. 401-406];
Wild and Scenic Rivers Act [16 U.S.C. 1271-1287]; Emergency Wetlands
Resources Act [16 U.S.C. 3921, 3931]; Wetlands Mitigation, [23 U.S.C.
119(g) and 133(b)(3)]; Flood Disaster Protection Act [42 U.S.C. 4001-
4130].
9. Hazardous Materials: Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) [42 U.S.C. 9601-9675];
Superfund Amendments and Reauthorization Act of 1986 (SARA); Resource
Conservation and Recovery Act (RCRA) [42 U.S.C. 6901-6992(k)].
10. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988
Floodplain Management; E.O. 12898, Federal Actions to Address
[[Page 11823]]
Environmental Justice in Minority Populations and Low Income
Populations; E.O. 11593 Protection and Enhancement of Cultural
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America;
E.O. 11514 Protection and Enhancement of Environmental Quality; E.O.
13112 Invasive Species.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Authority: 23 U.S.C. 139(l)(1).
Issued on: February 17, 2021.
Karen M. Brunelle,
Director, Office of Project Development, Federal Highway
Administration, Tallahassee, Florida.
[FR Doc. 2021-03930 Filed 2-25-21; 8:45 am]
BILLING CODE 4910-RY-P