Federal Highway Administration
Environmental Impact Statement: Little Cottonwood Canyon, Salt
Lake County, Utah
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of intent to prepare an Environmental Impact Statement.
-----------------------------------------------------------------------
SUMMARY: FHWA, on behalf of the Utah Department of Transportation
(UDOT), is issuing this notice to advise the public that an
Environmental Impact Statement (EIS) will be prepared for proposed
transportation improvements in and near Little Cottonwood Canyon in
Salt Lake County, Utah.
FOR FURTHER INFORMATION CONTACT: Brandon Weston, Environmental Services
Director, Environmental Services Division, UDOT 4501 South 2700 West,
P.O. Box 141265, Salt Lake City, Utah 84114-1265; Telephone: (801) 965-
4603, email: brandonweston@utah.gov. John Thomas, PE, Little Cottonwood
Canyon Project Manager, UDOT Region 2, 2010 South 2760 West, Salt Lake
City, UT 84104-4592; Telephone: (801) 550-2248, Email:
johnthomas@utah.gov.
SUPPLEMENTARY INFORMATION: The environmental review, consultation, and
other actions required by applicable federal environmental laws for
this project are being or have been carried out by UDOT pursuant to 23
U.S.C. 327 and a Memorandum of Understanding dated January 17, 2017,
and executed by FHWA and UDOT. UDOT, as the assigned National
Environmental Policy Act (NEPA) agency, will prepare an EIS for
proposed improvements to SR-210, a two-lane roadway, in Little
Cottonwood Canyon in Salt Lake County, Utah. The proposed project study
area extends from the intersection of SR-210 and SR-190/Fort Union
Boulevard in Cottonwood Heights, Utah to the terminus of SR-210 in the
town of Alta, Utah. Transportation improvements are needed to address
congestion, improve safety for all users, and enhance the availability
of public transportation options in the canyon. To address these needs,
UDOT is proposing to make operational improvements, introduce demand-
management measures, and support efforts by transit providers to
implement increased transit service in the project study area. UDOT has
developed this proposal based on numerous previous studies and public
involvement efforts carried out by a range of agencies and stakeholders
regarding the need for potential transportation improvements in the
project study area. The project may require FHWA to appropriate
National Forest System lands and transfer such lands to UDOT for
highway use, pursuant to authority under 23 U.S.C. 317. The project may
also require approvals by the USDA Forest Service, the U.S. Army Corps
of Engineers, and/or other agencies.
UDOT will consider a range of alternatives based on the purpose of
and need for the project and taking into account agency and public
input. The currently contemplated alternatives include: (1) Taking no
action; (2) multiple, combined actions, including:
Transportation System Management (TSM);
Making operational improvements;
Introducing demand-management measures;
Tolling and/or high-occupancy vehicle (HOV) programs;
Facilitating implementation of improved public transit
service;
Enhancing safety, access, and mobility in the area through
improved information sharing and adding designated parking areas; and
Roadway improvements;
(3) different combinations of any of the above; and (4) other
alternatives if identified during the scoping process. Alternatives
that do not meet the project purpose and need or that are otherwise not
reasonable will not be carried forward for detailed consideration.
A Coordination Plan is being prepared to define the agency and
public participation procedure for the environmental review process.
The plan will outline (1) how agencies and the public will provide
input during the scoping process; (2) the development of the purpose
and need; and (3) alternatives development. UDOT anticipates that the
USDA Forest Service will be invited to serve as a cooperating agency in
the NEPA process.
Letters describing the proposed action and soliciting comments will
be sent to appropriate Federal, state, and local agencies as well as to
Native American tribes and to private organizations and citizens who
have previously expressed, or who are known to have, an interest in
this proposal. A public scoping meeting will be held on April 10, 2018
from 4:00 p.m. to 8:00 p.m. at Cottonwood Heights City Hall, 2277 East
Bengal Boulevard, Cottonwood Heights, Utah 84121. Public notices
announcing the meeting will be published in the region. Information
regarding this meeting and the project may also be obtained through a
public website maintained by UDOT at www.udot.utah.gov/littlecottonwoodeis.
During the NEPA process, other public meetings will be held as
appropriate to allow the public, as well as Federal, state, and local
agencies, and tribes, to provide comments on the purpose of and need
for the project, potential alternatives, and social, economic, and
environmental issues of concern.
In addition, a public hearing will be held following the release of
the Draft EIS. Public notice advertisements and direct mailings will
notify interested
[[Page 10546]]
parties of the time and place of the public meetings and the public
hearing. The Draft EIS will be available for public and agency review
and comment prior to the public hearing.
To ensure that the full range of issues related to this proposed
action is addressed and all significant issues are identified, comments
and suggestions are invited from all interested parties. Written
comments or questions concerning this proposed action and the EIS
should be directed to UDOT representatives at the mail or email
addresses provided above by May 4, 2018. For additional information
please visit the project website at www.udot.utah.gov/littlecottonwoodeis. Information requests or comments can also be
provided by email to littlecottonwoodeis@utah.gov.
(Catalog of Federal and Domestic Assistance Program Number 20.205,
Highway Research, Planning and Construction. The regulations
implementing Executive Order 12372 regarding intergovernmental
consultation on Federal programs and activities apply to this
program.)
Dated: March 5, 2018.
Ivan Marrero,
Division Administrator, Federal Highway Administration, Salt Lake City,
Utah.
[FR Doc. 2018-04808 Filed 3-8-18; 8:45 am]
BILLING CODE 4910-22-P