Environmental Impact Statement; Mobile and Baldwin Counties, Alabama |
|---|
Topics: Interstate Highway System
|
Mark D. Bartlett
Federal Highway Administration
5 June 2017
[Federal Register Volume 82, Number 106 (Monday, June 5, 2017)]
[Notices]
[Pages 25904-25905]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-11543]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement; Mobile and Baldwin Counties,
Alabama
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of Intent to prepare a Supplemental Draft Environmental
Impact Statement.
-----------------------------------------------------------------------
SUMMARY: The FHWA in cooperation with the Alabama Department of
Transportation (ALDOT), will prepare a limited scope Supplemental Draft
Environmental Impact Statement (SDEIS) for the I-10 Mobile River Bridge
and Bayway Widening project in Mobile and Baldwin Counties, Alabama.
The Draft Environmental Impact Statement (DEIS) was approved by FHWA on
July 22, 2014. The purpose of the SDEIS is to evaluate new information
regarding environmental impacts and changes in project conditions that
have occurred since the July 2014 DEIS.
FOR FURTHER INFORMATION CONTACT: Mr. Mark D. Bartlett, Division
Administrator, Federal Highway Administration, 9500 Wynlakes Place,
Montgomery, Alabama 36117; Email: mark.bartlett@dot.gov; Telephone:
(334) 274-6350.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the ALDOT,
will prepare a limited scope SDEIS in accordance with 23 CFR 771.130(f)
and 40 CFR 1502.9 for the proposed project which includes increasing
the capacity of Interstate Route 10 (I-10) by constructing a new bridge
across the Mobile River and increasing the capacity of I-10 across
Mobile Bay from four to eight lanes. The DEIS for the project was
approved on July 22, 2014 (FHWA-AL-EIS-14-01-D). The DEIS evaluated a
wide range of alternatives, including the No Build Alternative and four
Build Alternatives. Alternative B was identified as the Preferred
Alternative. Public Hearings were held on September 23 and September
29, 2014, following approval of the DEIS.
The purpose of the SDEIS is to identify changes, new information,
and activities that have occurred in the project since the July 2014
DEIS. Based on coordination between FHWA and ALDOT, the issues to be
addressed in the SDEIS will include, but are not limited to:
Refinements in Alternative B', storm surge analysis, tolling as a
funding mechanism, Section 4(f) Evaluation, Section 106 consultation,
bicycle/pedestrian facilities, threatened and endangered species,
ecological resources, hazardous materials, cultural resources surveys,
and agency coordination and public outreach activities. The SDEIS will
review information from the original DEIS, incorporate new information
into the SDEIS, and update the impacts and analyses where changes have
occurred since the DEIS was approved. The DEIS is available at:
www.mobileriverbridge.com.
The SDEIS will follow the same process and format as the original
DEIS, except that scoping is not required. Following approval of the
SDEIS, FHWA plans to issue a combined Final Environmental Impact
Statement (FEIS)/Record of Decision (ROD).
Public involvement is a critical component of the National
Environmental Policy Act (NEPA) project development process and will
occur throughout the development of the environmental documents.
Environmental documents will be made available for review by resources
agencies and the public. Notification of the availability of the SDEIS
for public and agency review will be made in the Federal Register, the
project's Web site (www.mobileriverbridge.com), and through other
methods to be jointly determined by FHWA and ALDOT. Those methods will
identify where interested parties can go to review a copy of the SDEIS.
The agency and public comment period on the SDEIS will end no sooner
than 45 days after the Notice of Availability is published in the
Federal Register.
Public Hearing(s) will be held following the availability of the
SDEIS and as necessary. The Public Hearing(s) will be held in
accessible locations and at convenient times. The Public Hearing(s)
will be conducted by ALDOT and announced a minimum of 30 days in
advance of the hearings. Individuals will be provided the opportunity
to offer official comments by publicly expressing their views to
representatives of ALDOT and others in attendance, privately to a court
reporter, or by submitting written comments. The
[[Page 25905]]
ALDOT will provide FHWA with a transcript of the Public Hearing(s) and
copies of submitted written comments.
The SDEIS will comply with other Federal and State requirements
including the State Water Quality Certification under Section 401 of
the Clean Water Act; protection of water quality under the National
Pollutant Discharge Elimination System; protection of threatened and
endangered species under Section 7 of the Endangered Species Act; and
protection of cultural resources under Section 106 of the National
Historic Preservation Act.
To ensure that a full range of issues related to this proposed
action are addressed and all significant issues are identified,
comments and suggestions are invited from interested parties. Comments
or questions concerning this proposed action and the SDEIS should be
directed to the FHWA representative at the address above.
Authority: 23 U.S.C. 315; 23 CFR 771.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Issued on: May 30, 2017.
Mark D. Bartlett,
Division Administrator, Federal Highway Administration, Montgomery,
Alabama.
[FR Doc. 2017-11543 Filed 6-2-17; 8:45 am]
BILLING CODE 4910-22-P