Environmental Impact Statement, San Diego County, California |
|---|
|
Manuel E. Sánchez
Federal Highway Administration
November 7, 2012
[Federal Register Volume 77, Number 216 (Wednesday, November 7, 2012)]
[Notices]
[Page 66910]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-27227]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement, San Diego County, California
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of Withdrawal.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that the
Notice of Intent to prepare an Environmental Impact Statement (EIS) for
the proposed State Route 75/282 Transportation Corridor Project in the
city of Coronado in San Diego County, California (Federal Register Vol.
72, No 10; FR Doc E7-491) will be withdrawn.
FOR FURTHER INFORMATION CONTACT: Manuel E. Sanchez, Senior
Transportation Engineer/Border Engineer, Federal Highway
Administration--California Division, 401 B Street, Suite 800, San
Diego, CA 92101, Regular Office Hours: 6:30 a.m. to 4:00 p.m.,
Telephone: (619) 699-7336, Email: manuel.sanchez@dot.gov, or Bruce L.
April, Deputy District Director--Environmental, Caltrans District 11,
4050 Taylor Street, MS 242, San Diego, CA 92110, Regular Office Hours:
8:00 a.m. to 5:00 p.m., Telephone: (619) 688-0100, Email: Bruce_April@dot.ca.gov.
SUPPLEMENTARY INFORMATION: The FHWA, on behalf of the California
Department of Transportation (Caltrans) is advising the general public
that Caltrans conducted studies of the potential environmental impacts
associated with the proposed highway project. The SR-75/282
Transportation Corridor Project is located in San Diego County, west of
the San Diego-Coronado Bridge and uses the Fourth Street and Third
Street couplet to the naval Station Air Station North Island (NASNI).
The project proposed various alternatives to improve traffic congestion
encountered along State Routes 75 and 282, which included a
Transportation Demand Management/Transportation System Management
alternative, Grade Separation alternatives, Cut and Cover Tunnel
alternatives and Bored Tunnel alternatives. The distance of the project
is approximately 1.5 miles.
Issued on: November 1, 2012.
Manuel E. S[aacute]nchez,
Senior Transportation Engineer/Border Engineer, Federal Highway
Administration, San Diego, California.
[FR Doc. 2012-27227 Filed 11-6-12; 8:45 am]
BILLING CODE 4910-22-P